Power Usage Effectiveness, Data Center infrastructure Efficiency, Water Usage Effectiveness and Carbon Usage Effectiveness, benchmarked against current industry averages.

Power Usage Effectiveness (PUE)

PUE = total facility energy (kWh) ÷ IT equipment energy (kWh)

PUE

1.54

Exactly at the industry average of 1.54.

Overhead (cooling, power distribution, lighting) uses 54% of the energy drawn by IT equipment. A perfect PUE is 1.0.

AI interpretation · not an audit or compliance assessment

DCiE

64.94 %

Exactly at the typical DCiE of ~64.9%.

DCiE = (IT equipment power ÷ total facility power) × 100 — the percentage of total facility power that directly operates IT equipment. It is simply 1 ÷ PUE expressed as a percentage, and a higher percentage means better efficiency. 100% would mean every watt reaches IT equipment.

AI interpretation · not an audit or compliance assessment

Water Usage Effectiveness (WUE)

WUE = annual onsite water usage (L) ÷ annual IT equipment energy consumption (kWh)

WUE

1.8 L/kWh

Within the traditional evaporative cooling benchmark range of 1.8–1.9 L/kWh.

Industry reference points: 1.8–1.9 L/kWh traditional evaporative, 0.05–0.2 L/kWh hyperscale air-cooled, 0.10 L/kWh best-in-class closed-loop / direct-to-chip.

AI interpretation · not an audit or compliance assessment

Carbon Usage Effectiveness (CUE)

CUE = total carbon emissions (kgCO₂e) ÷ IT equipment energy usage (kWh)

CUE tells you how much carbon dioxide your facility emits for every unit of energy used by IT equipment — so the same load looks very different on a renewable grid than on a fossil-fuel one.

CUE

0.35 kgCO₂e/kWh

Within the fossil-fuel reliant grid benchmark range of 0.3–0.7 kgCO₂e/kWh.

Industry reference points: near 0 kgCO₂e/kWh for facilities powered by renewables or on-site generation, 0.05–0.3 for grids with a large renewable or nuclear share, and 0.3–0.7 for fossil-fuel reliant grids.

AI interpretation · not an audit or compliance assessment

How to use

  1. Take annual totals from utility meters for the whole facility, in kWh.
  2. Take IT load from PDU / UPS output metering — servers, storage, network only.
  3. For WUE, use onsite potable and non-potable water consumed over the same year.
  4. For CUE, use total emissions for the same period — utility bill emission factors, your supplier’s grid intensity, or a market-based residual mix — in kgCO₂e.